top of page
PT Engineering completed studies for Grady Brown Elementary School and Cedar Ridge High School in Hillsborough, North Carolina. These two schools are across the street from one another and have different start/dismissal times. Some of the existing traffic and safety issues included queuing from school driveways onto the adjacent roadways and pedestrian crashes. Recommendations for Grady Brown Elementary School included construction of a new parent driveway with increased internal storage on campus. Recommendations for Cedar Ridge High School included altering the on-campus traffic patterns to increase the internal storage and implementation of staggered dismissal times to minimize conflicts between student and parent drivers.
bottom of page